Disconnect and shutdown
PV disconnecting means, rapid-shutdown switches, service equipment, and source relationships.
PV equipment, service, and utility identification
Build durable red and white PV disconnect, rapid-shutdown, rating, source, directory, meter, and utility labels from guided starting presets.
Electrical identification workflow
The solar builder includes starting layouts for PV system disconnects, rapid-shutdown switches, photovoltaic power-source markings, DC and AC ratings, power-source output connections, dual-source warnings, utility disconnects, production meters, source directories, and supply-side generation connections.
Each preset identifies its reference and explains what must be checked. Some labels require project values from the approved design. Others depend on the serving utility, the adopted edition of NFPA 70, National Electrical Code, local amendments, the permit set, equipment listing instructions, or the authority having jurisdiction. A passing builder check is a formatting review, not engineering approval or an AHJ determination.
Common label groups
PV disconnecting means, rapid-shutdown switches, service equipment, and source relationships.
DC and AC values, energized line/load warnings, source output connections, and dual-source conditions.
Power-source directories, utility disconnects, production meters, and utility-specific wording.
Code and material questions
No. It checks selected fields and common wording conditions. The customer remains responsible for confirming the adopted code, approved permit set, serving-utility rules, exact installation location, attachment, material, visibility, and AHJ acceptance.
Choose the appropriate preset and describe the requirement in the project notes. Reflective or listed applications must be confirmed before production because the standard red/white layered acrylic may not satisfy every project specification.
Yes. Presets that require electrical values flag blanks, TBD text, and unfinished placeholders before the run can be submitted.
Use approved project information
Select the equipment function, replace every project value, review the cited starting reference, and download a proof before submitting.
Open solar label builder